Product Specification
Handles product specification with open points flagged rather than assumed.
What this involves, and the points we confirm at intake.
What this involves, and the points we confirm at intake.
Handles product specification with open points flagged rather than assumed.
Tracked per project: engineering spec translation.
Runs medical equipment spec through the same check every time.
Available for technical specification on the same review path.
Handles last will and testament translation against the terminology list you supply, or one we build.
Runs sec filing document translation through the same check every time.
Values that depend on the document stay pending until intake confirms them.
| Item | How it is handled |
|---|---|
| Product Specification | Accepted. Handling is confirmed at intake and recorded on the order. |
| Engineering Spec Translation | Accepted. Handling is confirmed at intake and recorded on the order. |
| Medical Equipment Spec | Accepted. Handling is confirmed at intake and recorded on the order. |
| Technical Specification | Accepted. Handling is confirmed at intake and recorded on the order. |
| Last Will and Testament Translation | Accepted. Handling is confirmed at intake and recorded on the order. |
| SEC Filing Document Translation | Accepted. Handling is confirmed at intake and recorded on the order. |
Anything that depends on the recipient is confirmed in writing before we begin.
Sets out Product Spec Engineering and what we need from you before work starts.
Guides and checklists published on this site.
We review the document, confirm the language pair and the receiving institution, then send pricing and turnaround in writing.
Tell us the document type and the language pair, and we will confirm what we need to start.
Tell us about your document and we will confirm the next step by email.
Send request